Joint Housing Land Availability Study

The Authority undertakes an annual Housing Land Availability Study, which calculates the amount of land available for residential development within the National Park. A minimum 5 years supply should be maintained. The Joint Housing Land Availability Study Report provides the latest figures for the Authority.

2017

JHLAS Timetable 2017

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2017

2016

JHLAS Timetable 2016

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2016

2015

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2015

JHLAS 2015 Statement of Common Ground

2014

JHLAS Timetable 2014

JHLA 2014 - Site Details

JHLAS 2014 - Final Statement of Common Ground

Inspectors Report 2014

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2014

2013

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2013

Inspectors Report 2013

JHLAS Timetable 2013

Draft Site Schedules

Statement of Common Ground 2013

2012

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2012

2011

Pembrokeshire Coast National Park Joint Housing Land Availability Study Report 2011

Pembrokeshire Coast National Park Residential Land Availability Schedule 2011

Inspectors Report 2011

Land Implementation Study March 2012

Hyder Consulting was commissioned by the National Park Authority to prepare a Land Implementation Study to research the costs of requirements to developing sites allocated for residential and mixed development in the Local Development Plan. The study focusses on the key physical infrastructure improvements required to bring each of the sites forward for development and includes landowner intentions for the sites. Information has been provided on development trajectories for each site. For further information please contact the Park Direction Team on devplans@pembrokeshirecoast.org.uk