Home » Living In » Planning » Policy » Local Development Plan 2 » Preparation Stages » Deposit Plan » LDP 2 - New and Amended Sites

Local Development Plan 2 - New and Amended Sites

Land allocations are set out in the Deposit Plan where details of consultation arrangements are also provided.

As part of the Preferred Strategy consultation an opportunity was provided to submit new sites or amend sites already submitted.

An assessment of which sites accord or do not accord with the draft Preferred Strategy was undertaken by the National Park Authority.

Even though the Authority has recorded its own views on the alternative or amended sites if stakeholders have a view on these sites they must be submitted as part of the Deposit consultation. There is potential for this to change through the Examination and stakeholders need to express their views on the alternative sites now.

The Authority’s guidance on the submission of sites at Preferred Strategy stage can be found here: http://www.pembrokeshirecoast.wales/default.asp?PID=796   

All of the sites submitted have been included on a New and Amended Sites list (see table below) which enables anyone to view the sites that have been submitted.

The Table below groups sites by Community Council area and includes the assessment (Deposit Plan stage) and conclusions reached for each site by the Authority and a map of each site.

New and Amended SitesTable