COVID-19 (Coronafeirws)

O ganlyniad i effaith Covid-19 (Coronafeirws), mae Awdurdod Parc Cenedlaethol Arfordir Penfro wedi cau ei bencadlys, atyniadau i ymwelwyr (Castell Caeriw, Castell Henllys ac Oriel y Parc), ei feysydd parcio ac adrannau o Lwybr Arfordir Penfro nes ceir rhybudd pellach. Mae pob digwyddiad a chyfarfod wedi’i ganslo hyd nes ceir rhybudd pellach. Os oes gennych unrhyw ymholiadau, ffoniwch 01646 624800, neu anfonwch e-bost at gwybodaeth@arfordirpenfro.org.uk

I’n helpu ni i wneud y wefan hon yn well, mae’r gosodiadau cwcis wedi eu gosod i 'ganiatáu pob cwci'. Os byddwch yn parhau heb newid y gosodiadau hyn, rydych yn cydsynio i hyn ddigwydd – am ragor o wybodaeth ac i newid hyn ar unrhyw adeg, gweler ein polisi preifatrwydd. Preifatrwydd.   

Hafan » Byw Yn » Cynllunio » Ceisiadau Cynllunio Mawr » NP/18/0502/FUL

NP/18/0502/FUL

Application Form
Archaeology Report (1 of 5)
Archaeology Report (2 of 5)
Archaeology Report (3 of 5)
Archaeology Report (4 of 5)
Archaeology Report (5 of 5)
Ecological Survey
Design & Access Statement (1 of 2)
Design & Access Statement (2 of 2)
Preliminary Ecological Appraisal
Ground Investigation Geotechnical Report
Pre-application consultation report
Services Report
Transport Statement
Arboricultural Plan
Arboricultural Impact Assessment


Risk Assessment 1 to 26
Risk Assessment 27 to 36
Risk Assessment 37 to 42
Risk Assessment 43 to 52
Risk Assessment 53 to 82
Risk Assessment 83 to 132
Risk Assessment 133 to 179

Flood Consequences Assessment (FCA)
Flood Consequences Assessment General Notes
FCA Appendix A - Fig 1 - Site Location Plan
FCA Appendix A - Fig 2 - Existing Site Layout
FCA Appendix A - Fig 3 - Proposed Site Layout
FCA Appendix B - NRW(i)
FCA Appendix B - NRW(ii)
FCA Appendix B - NRW(iii)
FCA Appendix C - PCC(i)
FCA Appendix C - SFHC(ii)
 

Landscape Strategy
Proposed Drainage Layout
Proposed Drainage Site Plan
Proposed Harbour Entrance Works Plan
Vehicle Tracking Results 1 of 2
Vehicle Tracking Restults 2 of 2
Ocean Square Site Location Plan
Coal Office Existing Site Plan
Coal Office existing floor plan
Coal Office Demolition Site Plan
Coal Office Demolition Floor Plan
Ocean Square proposed ground floor plan with survey
Ocean Square proposed ground floor plan
Ocean Square proposed 1st floor plan
Ocean Square proposed 2nd floor plan
Ocean Square proposed roof plan
Existing ticket office
Ocean Square Proposed sections
Coal Office existing elevations
Ocean Square proposed elevations 1 of 2
Ocean Square proposed elevations 2 of 2

 

Amended Application Information received 11 January 2019​
Application Forms (Amended)
P(0)104 Ocean Square Proposed Ground Floor Plan with Survey_rev F
P(0)105 Ocean Square Proposed Ground Floor Plan_rev F
P(0)106 Ocean Square Proposed First Floor Plan C
P(0)107 Ocean Square Proposed Second Floor Plan C
P(0)120 Ocean Square Proposed Sections_rev C
P(0)150 Bat Access - Roof Plan Rev A
Saundersfoot Design and Access Statement (DAS) Part 1
Saundersfoot Design and Access Statement (DAS) Part 2
Fig 1 - Site Location Plan
Fig 2 - Existing Site Layout
Fig 3 - Proposed Site Layout
Flood Consequence Assessment (FCA)
General Notes FCA

Landscape Proposal.